New Idea for better & low cost Insulation
technologist | 09 Mar, 2008, 23:13 | Cooling Towers | (352 Reads)

Common problem of carrying out calculation of optimum insulation thickness, Yet loosing lot of energy in the form of heat loss or cold loss, need re-work on insulation due to damage over a certain period of 2-3 years during annual turnaround etc. etc..............

Poor process engineers. Need survey of thickness, need good maintenance & monitoring program....lots of cost items..& still not satisifed.

After so many years of struggle, I thought about this Idea which is very cost effective & higher savings for lifetime. No need of re-work etc. No maintenance cost.

Interesting.........Ya....Very good business idea too....here is my input

Read More....


Trackback URL: http://www.chemicalblogs.com/trackback.php?id=579